Oracle 1z0-1075-22 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Describe Manufacturing Supervisor Mobile Applications
  • Describe Import Production Transactions
Topic 2
  • Evaluate a Work Order completion cost, including Partial and Scrap
  • Explain Work Order Reservations and History
Topic 3
  • Explain Cost Reporting, including WIP Inventory Valuation Report
  • Set up Plant Parameters and Security, Profile Options, Lookups and DFFs
Topic 4
  • Explain Production Transaction Review and Product Genealogy
  • Configure Resources, Operations, and Work Centers
Topic 5
  • Describe Production Execution transactions (including Outside Processing)
  • Set up common Configuration Elements
Topic 6
  • Describe Managerial Accounting Basics & Cost Accounting
  • Describe how work definition is automatically generated
Topic 7
  • Execute Basic Transaction and Work Order Reporting
  • Explain Work Execution Work Areas
Topic 8
  • Describe Work Definition versions
  • Describe Manufacturing Cloud integrations
  • Report Production Transactions
Topic 9
  • Transfer Production Transactions to Costing
  • Manage Production Calendars and add Shift and Work Center Resource exceptions

 

NEW QUESTION 21
A production operator needs to review the materials issued, resources charged, and operations performed for a job that was executed inthe previous shift.
Identify the task the operator has to select to review all the transactions in a single place for both Work Order and Orderless execution.

  • A. Review Dispatch List
  • B. Manage Work Orders
  • C. Report Resource, Material and OperationTransactions
  • D. Review Production Transaction History

Answer: B

 

NEW QUESTION 22
Identify three requirements fulfilled by nonstandard work orders.

  • A. Rescheduling
  • B. Rework
  • C. Repair
  • D. Prototype

Answer: B,C,D

 

NEW QUESTION 23
The Plant Manager informs you that they have bought several machines for their manufacturing plant ABC.
The plant has been set up with a separate cost element set ABC in Manufacturing Cloud. You are requested to configure these machines in such away that those are costed to the work order for which operations are performed on these machines.
Identify the correct setup that you will advise to the Plant Manager.

  • A. Set up the machines as cost element type of "Overhead" by selecting Cost Element set ABC.
  • B. Set up the machines as cost element type of "Overhead" by selecting Cost Element set Common.
  • C. Set up the machines as cost element type of "Resource" by selecting Cost Element set ABC.
  • D. Set up the machines as cost element type of "Resource" by selecting Cost Element set Common.

Answer: D

 

NEW QUESTION 24
Planning Central has collected manufacturing data for a Work Order WO-2045 (Make Item AS1000), where actual duration of work order is 2 days. Item AS1000 manufacturing lead time is 1.25 days.
A plan is run and the Work Order WO-2045 is rescheduled.
Identify the duration of the rescheduled Work Order WO- 2045.

  • A. Rescheduled Work Order WO-2045 duration = 2 days
  • B. Rescheduled Work Order WO-2045 duration = 3.25days
  • C. Rescheduled Work Order WO-2045 duration = 1.25 days
  • D. Rescheduled Work Order WO-2045 duration = 0.75days

Answer: D

 

NEW QUESTION 25
In a Manufacturing Cloud post productionsupport environment, a user wants to update some of the operations in the work orders by using the Midpoint Scheduling feature. However, the user is unable to update any of the orders.
Identify two reasons.

  • A. The operations are missing sequence.
  • B. None of the operations include scheduled resources.
  • C. The scheduled resources are not part of the organization selected by the user.
  • D. The work order operations do not have operations start or completion date.

Answer: A,B

 

NEW QUESTION 26
You arereviewing the production status of your manufacturing plant shop floor as a production supervisor.
Your production manager wants a report on a work order statuswhich is reserved against a particular customer.
The final assembly of the work order is serialized.
Which option shows the steps to complete the task using the mobile application?

  • A. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page> Select required work orders> Click Social icon (OSN) > Select recipient, and click Share.
  • B. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page > Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, and click Send.
  • C. Select the infotile Customer to open the work order details page> Click Actions and select the E-mail icon> Select required work orders>Select the e-mail client, enter the recipient's e-mail, and click Send.
  • D. Search the work order by customer name to open the work order details page> Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, andclick Send.

Answer: B

 

NEW QUESTION 27
Which two steps should you use to create a new Oracle Transactional Business Intelligence report in the ManufacturingCloud?

  • A. Use Business Intelligence answers to create the report.
  • B. Use Business Intelligence publisher to create a template anduse that template to create the report.
  • C. Use the Manufacturing subject area to select the report columns and create the report.
  • D. Use ibots to create the report.

Answer: A,B

Explanation:
Explanation
You can use Oracle Transactional Business Intelligence to create analysis and Oracle Business Intelligence Publisher to create reports.

 

NEW QUESTION 28
A Production Supervisor queries a Work Order (WO-1025) from the manage Work Orders page. On the Entering Edit Work Order: WO-1025 page, he finds General Information, Operations and History tab, but not the Reservations tab.
Identify the two reasons that can cause the Reservations tab not to be displayed.

  • A. Work Order (WO-1025) is not a Pick-to-order Work Order.
  • B. Work Order (WO-1025) is not a Configured item Work Order.
  • C. Work Order (WO-1025) is not a Drop-ShipWork Order.
  • D. Work Order (WO-1025) is not a Back-to-Back Work Order.
  • E. Work Order (WO-1025) is not a Plan-to-produce Work Order.

Answer: B,C

 

NEW QUESTION 29
In a manufacturingcloud implementation, production operators want to perform work order updates using Dispatch List.
Identify two tasks that the Dispatch List allows the production users to perform.

  • A. Report Receipts
  • B. Report Material Transactions by Quantity and Serial Number
  • C. Report Cost Transactions
  • D. Report Component Returns
  • E. Report Resource Transactions

Answer: B,E

 

NEW QUESTION 30
Identify two reports that provide work ordercost-related information to the costing user.

  • A. Work order Operational Analysis
  • B. WIP Balance by Plant
  • C. Cost Accounting Dashboard
  • D. Purchase Variance Summary

Answer: A,C

 

NEW QUESTION 31
During a Manufacturing Cloud implementation, the Production Supervisor wants to close thework orders for last month and wants to make sure that the work orders include the correct cost.
Identify the approach to be taken by the Production Supervisor.

  • A. Work order costs can be updated anytime regardless of the status of the work order.
  • B. The Production Supervisor need not include cost variances while costing last month's workorders because those can be applied directly in subledger accounting.
  • C. The Production Supervisor should make sure that all costs are included while closing last month's work orders; however, variances can be included after closing the work orders.
  • D. The Production Supervisor needs to include all costs and variances in last month's work orders and close them; however, the work orders where updates are expected, should not be closed.

Answer: D

 

NEW QUESTION 32
Work order costs are computed based on material and resource transactions reported and the cost method of the product. In a manufacturing plant, the production operatorhas completed a work order WO-001 ensuring proper materials and resource transactions. The materials are costed and resources are defined with rates.
A cost accountant has created cost accounting distributions. Upon reviewing the accounting distributions of the work order WO-001, resources charged to the work order are missing.
Identify the Concurrent Request that needs to be submitted to transfer resource charges to cost accounting.

  • A. Transfer Transactions from Production to Costing
  • B. Transfer Costs to Cost Management
  • C. Create accounting
  • D. Transfer Transactions from Inventory to Costing

Answer: A

 

NEW QUESTION 33
Your customer has defined the work definitions. They have created and saved a new version for the work definition and want to edit that work definition.
Which two attributes cannot be updated using the Edit Work Definition Details action?

  • A. Version
  • B. State Date
  • C. CostingPriority
  • D. Production Priority

Answer: A,B

 

NEW QUESTION 34
TheManufacturing plant has two 8-hour shifts for the work center WC1: Day Shift and Night Shift. You associate four units each for resources R1, R2, R3, and R4 to the work center WC1. The customer wants to assign all units of resource R2 available for Day andNight Shift.
Identify the correct sequence of steps to achieve this requirement.

  • A. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.
  • B. Associate Resource R2 with Work Center WC1> Select Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.
  • C. Associate Resource R2 with Work Center WC1> Select the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column > Enter 2 in Night Shift Column.
  • D. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column> Enter 2 in Night Shift Column

Answer: C

 

NEW QUESTION 35
Your customer plans to use Oracle Representational State Transfer (REST) API with Oracle Supply Chain Management Cloud (Oracle SCM Cloud) to support integration requirements.
Identify four REST resources and thecorresponding HTTP action available with Manufacturing Cloud.

  • A. Work Orders PATCH method
  • B. Work Order Status GET method
  • C. Resource transaction POST method
  • D. Resource transaction GET method
  • E. Work Orders GET method
  • F. Work Order Status POST method

Answer: A,B,C,E

 

NEW QUESTION 36
As a production supervisor, you require immediate access to critical shop floor execution systems to take actionwhile on the go.
Which four work order related actions can be taken in the Manufacturing Supervisor mobile application?

  • A. Reviewing customer information of work orders
  • B. Releasing work orders using quick swipe details
  • C. Creating a new standard or non standard work order
  • D. Reviewing operation, component, and resource detail
  • E. Searching for work orders and sending them through e-mail
  • F. Executing standard work order and updating item and resource usage

Answer: A,B,D,E

 

NEW QUESTION 37
Identify three entities that must be set up in Oracle Manufacturing Cloud to create a Work Definition for an item that will be manufactured in-house.

  • A. Manufacturing Lead Time
  • B. Resources
  • C. Operations
  • D. Operation Items
  • E. Production Line

Answer: B,C,D

 

NEW QUESTION 38
A plant operates three continuous daily shifts of eight hours each for five days in a week. One unit of the resource R1 within the plant is assigned for two shifts to work area W1. On a particular day in a given week, due to unscheduled maintenance thatneeded to be performed on the resource R1, it was not available for two hours during each of the assigned shifts.
Determine the available capacity of the resource R1 for thatweek.

  • A. 78 hours
  • B. 60 hours
  • C. 76 hours
  • D. 70 hours

Answer: A

 

NEW QUESTION 39
......

1z0-1075-22 exam dumps with real Oracle questions and answers: https://www.examslabs.com/Oracle/Manufacturing-Cloud/best-1z0-1075-22-exam-dumps.html