NEW QUESTION # 22
An optical fiber cable comes with the specifications 50/125 um.
What do the numbers represent?
- A. The first number represents the diameter of the core; the second number represents the diameter of the cladding in microns.
- B. The first number represents the diameter of the core; the second number represents the actual diameter cable including the buffer and jacket.
- C. The first number represents the required distance to single-phase power cabling; the second number represents the required distance to three-phase cabling.
- D. The first number represents the distance for a 10 Gb/s connection; the second number represents the distance for a 1 Gb/s connection.
Answer: A
Explanation:
Optical fiber cables are composed of a core, a cladding, and a coating. The core is the central part of the fiber that carries the light signal. The cladding is the layer surrounding the core that reflects the light back into the core and prevents signal loss. The coating is the protective layer that covers the cladding and provides mechanical strength and environmental protection. The specifications of an optical fiber cable indicate the dimensions of the core and the cladding in microns (m), which are one millionth of a meter. For example, a
50/125 m cable has a core diameter of 50 m and a cladding diameter of 125 m. The coating diameter is usually
250 m, but it is not part of the specifications.
References: Multimode Optical Fiber Selection & Specification - Corning, Optical Fiber OM3 (50/125µm Multimode Fiber), 50/125 Graded-Index OM2 Optical Fiber - OFS
NEW QUESTION # 23
What is the most preferred unit of measure for cooling capacity?
- A. Ton
- B. BTU
- C. Horsepower
- D. Watt
Answer: D
Explanation:
Cooling capacity is the measure of a cooling system's ability to remove heat from a space. The most preferred unit of measure for cooling capacity is watt (W), which is the SI unit for power. Watt is defined as the amount of energy transferred or converted per unit time. One watt is equal to one joule of energy per second. Using watt as the unit of measure for cooling capacity allows for easy comparison and calculation of the cooling performance and efficiency of different cooling systems.
Other units of measure for cooling capacity are ton, BTU, and horsepower, but they are less common and less convenient than watt. Ton is a unit of measure that describes how much water at freezing temperature can be frozen in 24 hours, equivalent to 3.5 kW or 12,000 BTU/h. BTU (British Thermal Unit) is a unit of measure that describes the amount of heat required to raise the temperature of one pound of water by one degree Fahrenheit, equivalent to 0.293 W. Horsepower is a unit of measure that describes the rate at which work is done, equivalent to 746 W.
References:
*Data Centre Professional (CDCP®) Reference Materials, page 8, section 2.1.1
*Data Centre Professional (CDCP®) Preparation Guide, page 11, section 2.1.1
*Cooling capacity - Wikipedia
*Air Conditioner BTU Calculator
*Air conditioning 101: Basics, working principle and sizing ... - GlobalSpec
*How is cooling capacity measured? - Sage-Advices
*Everything You Need to Know About Cooling Capacity
NEW QUESTION # 24
Which one of the following is an Audible Signaling and Notification Device?
- A. Sirens
- B. Alarms
- C. Clocks
- D. Strobes
Answer: A
Explanation:
According to the CDCP® Preparation Guide, an audible signaling and notification device is a device that produces a sound to alert or notify the occupants of a data center of an event or condition. Sirens are examples of such devices, as they can emit loud and distinctive tones to warn of fire, emergency, or security incidents.
Strobes, on the other hand, are visual signaling and notification devices that produce flashes of light to attract attention or convey information. Alarms and clocks are not specific types of devices, but rather general terms that can refer to various audible or visual devices.
References: CDCP® Preparation Guide, page 30. Audible Visual Notification | System Sensor | Honeywell.
Audible-Visual Signaling Devices - AutomationDirect.
NEW QUESTION # 25
is the ability of a system or component to perform its required functions under stated conditions for a specified period of time.
- A. Agility
- B. Scalability
- C. Availability
- D. Reliability
Answer: D
Explanation:
According to the IEEE definition, reliability is the ability of a system or component to perform its required functions under stated conditions for a specified period of time. Reliability is a measure of how often a system or component fails, and how long it takes to recover from a failure. Reliability is closely related to availability, which is the degree to which a system or component is operational and accessible when required for use.
Reliability and availability are both affected by factors such as design, maintenance, testing, and environmental conditions.
References: EPI Data Centre Training Framework, CDCP Preparation Guide, Reliability engineering - Wikipedia
NEW QUESTION # 26
Do I need to check the local standards if I already comply to international standards?
- A. Data centres only need to comply to international standards since they are connected to a worldwide international network infrastructure.
- B. Compliance to only international standards is good enough as most local standards are derived from international standards.
- C. You need to check the local standards to ensure compliance to these standards.
- D. Local standards do not to be checked as some countries have too many local standards, which will slow down the data centre construction.
Answer: C
Explanation:
Data centre design and infrastructure standards can vary from country to country, depending on the local regulations, codes, and practices. Therefore, it is important to check the local standards before designing, building, or operating a data centre in a specific location. Compliance to only international standards may not be sufficient or adequate to meet the local requirements, which could result in legal, financial, or operational risks. For example, some countries may have stricter fire safety, environmental, or energy efficiency standards than the international ones. Some countries may also have different electrical standards, such as voltage, frequency, or plug types. By checking the local standards, you can ensure that your data centre is compliant, safe, and efficient in the local context.
References:
1: Data Center Design: Which Standards to Follow?2, page 1, section 1 3: The Most Important Data Center Design and Infrastructure Codes and Standards4, page 1, section 1 5: Explaining the new family of ISO Data Centre Standards6, page 1, section 1 7: Standards for data centre certification. Is a changing coming?8, page 1, section 1
NEW QUESTION # 27
Does unplanned downtime of a data centre have an impact on the business results?
- A. No, unplanned data centre downtime is already financially planned for in the yearly budget planning process.
- B. Yes, but data centre downtime only impacts the airline industry.
- C. Yes, data centre downtime can result in business downtime.
- D. No, because data centres operate independently from the business.
Answer: C
Explanation:
Data centres are essential for supporting the IT operations and applications of various businesses across different industries. Data centre downtime can have a negative impact on the business results, such as loss of revenue, customer satisfaction, productivity, reputation, and competitive advantage. According to a web search, the average cost of data centre downtime in 2020 was $8,851 per minute, and the average duration of a data centre outage was 95 minutes1. This means that a typical data centre outage could cost a business over
$840,000 in direct and indirect losses1. Therefore, data centre downtime can have a significant impact on the business results, regardless of the industry or sector.
References: Unplanned Downtime Costs More Than You Think, Downtime, Outages and Failures - Understanding Their True Costs, The Unplanned Downtime Nightmare - And How Operators Can Avoid
NEW QUESTION # 28
What is the best practice for cutting holes in the raised floor tile?
- A. Cut the tiles at the corner so the pedestals can be used as a vertical cable manager.
- B. Anywhere as data centre tiles are designed to allow cut-outs anywhere.
- C. Draw a line in the middle of the tile and never touch the line when making the cut.
- D. Draw a cross on the tile and when making a cut-out do not touch a line and avoid the corners.
Answer: D
Explanation:
According to the Raised Floor Installation Manual, the best practice for cutting holes in the raised floor tile is to draw a cross on the tile and when making a cut-out do not touch a line and avoid the corners1. This ensures that the structural integrity and load-bearing capacity of the tile are not compromised. Cutting holes anywhere, touching the line, or cutting the corners can weaken the tile and cause it to crack or collapse1. Additionally, the manual recommends using a drill press or a reciprocating saw with a metal or bi-metal cutting blade, and deburring all sharp edges1.
References: 1: Raised Floor Installation Manual, E. Recommended Cutting Tools, Page 1
NEW QUESTION # 29
systems are designed specifically to protect the structure of a building.
- A. Water sprinkler
- B. Inergen
- C. Total Flooding
- D. Pro-inert
Answer: A
Explanation:
Water sprinkler systems are designed to protect the structure of a building from fire by suppressing or extinguishing the flames with water. Water sprinkler systems are typically installed in the ceiling or walls of a building and are activated by heat or smoke detectors. Water sprinkler systems can reduce the risk of fire spreading and causing structural damage to the building.
References:
*EPI Data Centre Professional (CDCP®) Preparation Guide, page 28
*Fire Protection Systems for Data Centers | EPI
NEW QUESTION # 30
Does shielded twisted pair network cabling provide protection against EMF from power cables?
- A. No, the shielding is designed for alien cross-talk between network cables, it provides no or little protection against low frequency EMF.
- B. Yes, but only if the power cable is placed in a tre-foil cable arrangement.
- C. No, the shielding for twisted pair network cabling is for physical protection against vandalism and accidental cutting of the cable.
- D. Yes, as the shielding for twisted pair network cabling is specifically design for low frequency EMF protection.
Answer: A
Explanation:
Shielded twisted pair cables (STP) are Ethernet cables that feature additional protection against electromagnetic interference from external sources, such as radio waves, microwaves, or other network cables.
This is achieved by wrapping each pair of wires with a conductive shield, usually made of foil or braided wire, and then enclosing the entire cable with another shield layer. However, this shielding is not effective against low frequency electromagnetic fields (EMF) from power cables, which can induce currents and voltages in the network cables and cause signal distortion or data loss. Low frequency EMF can only be reduced by increasing the distance between the power and network cables, or by using a tre-foil cable arrangement, which is a special configuration of three power cables twisted together to cancel out the magnetic fields they generate.
References: STP Cable: Your Shield Against Network Disturbances; What is Shielded Twisted Pair Cable? - Advantages, Disadvantages; Shielded vs. Unshielded Cables: What's the Difference? - Cable Matters.
NEW QUESTION # 31
How many monitoring points should be used in Temperature Measurement?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: B
Explanation:
According to the EPI Data Centre Professional (CDCP®) Reference Materials, the recommended number of monitoring points for temperature measurement in a data centre is 3 per rack: one at the top, one at the middle, and one at the bottom1. This is to ensure that the temperature distribution within the rack is uniform and within the acceptable range for the equipment. The temperature sensors should be placed at the front of the rack, where the air enters the equipment, and not at the back, where the hot air exits1.
References: 1: EPI Data Centre Professional (CDCP®) Reference Materials, page 23.
NEW QUESTION # 32
Which type of Humidifier suspends quartz lamps over an open pool of water?
- A. Steam Canister Humidifier
- B. Infrared Humidifiers
- C. Ultrasonic Humidifier
- D. Water Canister Humidifier
Answer: B
Explanation:
Infrared humidifiers are a type of humidifier that use quartz lamps to heat water in an open pool and evaporate it into the air. They are energy-intensive and require frequent maintenance and cleaning. They are not recommended for data centers, as they can introduce contaminants and bacteria into the air, and increase the risk of fire and electrical hazards.
References: EPI Data Centre Training Framework, CDCP Preparation Guide, Make Humidification Adjustments | ENERGY STAR
NEW QUESTION # 33
Starting from which Rating does the requirement of Concurrently Maintainability becomes relevant?
- A. Rated-4
- B. Rated-1
- C. Rated-2
- D. Rated-3
Answer: D
Explanation:
The requirement of Concurrently Maintainability becomes relevant starting from Rated-3, according to the Uptime Institute Tier Classification System1. Concurrently Maintainability means that any component or system in the data centre can be maintained or replaced without affecting the availability of the IT equipment.
This requires having redundant capacity components and multiple independent distribution paths serving the IT equipment. Rated-3 data centres are designed to achieve Concurrently Maintainability and have a minimum uptime of 99.982%. Rated-4 data centres also have Concurrently Maintainability, but they also have Fault Tolerance, which means that they can withstand any single unplanned event without affecting the availability of the IT equipment. Rated-4 data centres have a minimum uptime of 99.995%. Rated-1 and Rated-2 data centres do not have Concurrently Maintainability, as they have only one distribution path serving the IT equipment and no redundant capacity components. Rated-1 data centres have a minimum uptime of 99.671% and Rated-2 data centres have a minimum uptime of 99.741%.
References:
1: Uptime Institute Tier Classification System2, page 1, section 1 2: Data Center Tiers Classification Explained: (Tier 1, 2, 3, 4)3, page 1, section 1 3: Data Center Tier Standards4, page 1, section 1
NEW QUESTION # 34
is the arithmetic mean of time between the failing and the subsequent running of the system in a particular time period.
- A. MCBF
- B. MTBF
- C. MTTR
- D. MLBF
Answer: B
Explanation:
MTBF stands for Mean Time Between Failures, and it is the arithmetic mean of time between the failing and the subsequent running of the system in a particular time period. MTBF is a measure of reliability that indicates how often a system or component fails during its operation. MTBF can be calculated by dividing the total operating time by the number of failures over a given period. For example, if a system operates for 1000 hours and experiences 5 failures, the MTBF is 1000/5 = 200 hours.
References: EPI Data Centre Training Framework, CDCP Preparation Guide, MTBF, MTTR, MTTF, MTTA:
Understanding incident metrics - Atlassian
NEW QUESTION # 35
What is the main difference between an Environmental Monitoring System (EMS) and a Building Management System (BMS)?
- A. A BMS only operates as a stand-alone system. An EMS can be configured as a redundant system.
- B. An EMS monitors only. A BMS monitors and controls.
- C. A BMS is only able to monitor dry contacts (on/off). An EMS can also monitor analog values.
- D. An EMS provides local alarms. A BMS provides both local and remote alarms.
Answer: B
Explanation:
The main difference between an Environmental Monitoring System (EMS) and a Building Management System (BMS) is that an EMS monitors only, while a BMS monitors and controls. An EMS is a system that collects and records data from various sensors and devices that measure environmental parameters, such as temperature, humidity, air quality, power, and water. An EMS provides alerts and reports based on the data, but it does not control or adjust the environmental conditions. A BMS is a system that integrates and manages various building systems, such as HVAC, lighting, security, fire, and access. A BMS not only monitors the data from these systems, but also controls and optimizes them to achieve the desired performance and efficiency. A BMS can also communicate with an EMS to receive data and provide feedback.
References:
1: Environmental Monitoring Systems vs Building Management Systems2, page 1, section 1 3: Building Monitoring System vs Environmental Monitoring System4, page 1, section 1 5: BUILDING AND ENVIRONMENTAL MANAGEMENT SYSTEMS AND HOW THEY MEET GMP ...6, page 1, section 1 7:
Environmental Monitoring System vs. Building Management System8, page 1, section 1
NEW QUESTION # 36
Which one of the following does a Physical Infrastructure consists of in a Data Centre?
- A. Server
- B. Hub
- C. Switch
- D. Rack
Answer: D
Explanation:
A physical infrastructure in a Data Center consists of racks, which are metal frames used to store and organize server and other IT equipment. The racks are usually arranged in rows and columns, and they can be used to hold servers, storage devices, and other pieces of IT equipment. The racks can also be used to organize cables and other components to ensure that the Data Center is kept organized and efficient.
NEW QUESTION # 37
What is a requirement of an FM200 (HFC-227) installation?
- A. Install the gas containers (tanks) close to the data centre.
- B. It is a high-pressure gas; therefore nozzles must be mounted with two brackets.
- C. Install pre-action sprinklers in the same room as the FM200.
- D. Drainage system under the raised floor.
Answer: B
Explanation:
FM200 (HFC-227) is a clean agent fire suppression system that uses a high-pressure gas to extinguish fires by reducing the oxygen concentration and absorbing the heat. FM200 is stored in cylinders at pressures of up to
42 bar (600 psi) and is released through nozzles into the protected area. Because of the high pressure, the nozzles must be mounted with two brackets to prevent them from moving or breaking during discharge. The brackets must be securely attached to the ceiling or wall and aligned with the nozzle outlet. The nozzle outlet must also be free of any obstructions that could affect the discharge pattern or distribution.
References:
*EPI Data Centre Professional (CDCP®) Preparation Guide, page 32
*FSL-227 Technical Manual, page 10
*Firetrace ILP Manual, page 21
NEW QUESTION # 38
Sprinkler heads used in computer rooms activate at what temperature?
- A. 57 °C (135 °F)
- B. 27 °C (81 °F)
- C. 70 C (158 °F)
- D. Only on direct contact with a flame
Answer: A
Explanation:
Sprinkler heads used in computer rooms activate at 57 °C (135 °F), which is the standard temperature rating for ordinary sprinklers. This is the temperature at which the heat-sensitive element of the sprinkler head, such as a glass bulb or a fusible link, breaks or melts, allowing water to flow from the sprinkler. Sprinkler heads are designed to activate only when exposed to a fire, not to ambient temperature fluctuations. Therefore, sprinkler heads should be installed at a sufficient distance from the heat sources, such as servers, racks, or ducts, to avoid accidental activation. Sprinkler heads should also be selected and installed in accordance with the relevant standards and codes, such as NFPA 13 and NFPA 75.
References:
1: CDCP Preparation Guide, page 24, section 2.4.3 2: Sprinkler Systems in Data Centers3, page 1, section 1 4:
Data Center Fire Protection5, page 1, section 2 6: Data Center Sprinkler System Design7, page 1, section 1
NEW QUESTION # 39
Which type of Humidifier rapidly vibrates waster to create a fog or mist?
- A. Steam Canister Humidifier
- B. Infrared Humidifier
- C. Ultrasonic Humidifier
- D. Water Canister Humidifier
Answer: C
Explanation:
An ultrasonic humidifier is a type of cool mist humidifier that uses a metallic diaphragm that vibrates at high frequencies to create water droplets that are added to the air. A fan projects these droplets into the air as mist, which then evaporates and humidifies the room. This type of humidifier rapidly vibrates the water to create a fog or mist.
References: EPI Data Centre Training Framework, How Humidifiers Can Help Allergies, Humidifier Buying Guide: Pros and Cons of Different Types.
NEW QUESTION # 40
When having two non-synchronized power sources, the ATS / STS need to be of the type:
- A. Break before make.
- B. Make before break.
- C. Both an ATS and STS can never handle two non-synchronized sources.
- D. Both make before break or break before make can be used.
Answer: A
Explanation:
When having two non-synchronized power sources, the ATS / STS need to be of the type break before make, which means that the switch disconnects from one source before connecting to the other source. This prevents any short circuit, back feed, or phase mismatch that could occur if the two sources were connected simultaneously. Break before make switches are also known as open transition switches, because they create a brief interruption in the power supply during the switching process. This interruption is usually acceptable for most ICT equipment, as they have internal power supplies or batteries that can handle the transient. However, if the interruption is not acceptable, then the two power sources need to be synchronized before switching, which requires a make before break switch, also known as a closed transition switch. Make before break switches connect to the second source before disconnecting from the first source, which ensures a seamless transfer of power without any interruption. However, make before break switches require that the two sources have the same voltage, frequency, and phase, which can be achieved by using a synchronization module or a phase-locked loop.
References:
1: CDCP Preparation Guide, page 17, section 2.3.1 2: STS in data centres - Borri3, page 1, section 1 4: Using Static Transfer Switches to Enhance Data Center ... - Donwil5, page 1, section 1 6: What is an Automatic Transfer Switch (Power)? | Ethan Banks7, page 1, section 1
NEW QUESTION # 41
Which one of the following is used in Measuring Business Value?
- A. Scalability
- B. Regeneration Cost
- C. Reliability
- D. Upfront Cost
Answer: A
Explanation:
Measuring business value is the process of assessing the benefits and costs of IT investments and initiatives in relation to the strategic objectives and priorities of the organization. One of the factors that can be used to measure business value is scalability, which is the ability of a system or component to handle increasing workloads or demands without compromising performance, quality, or functionality. Scalability is important for business value because it enables the organization to adapt to changing market conditions, customer expectations, and growth opportunities. Scalability can also reduce operational costs, increase efficiency, and improve customer satisfaction. Therefore, scalability is one of the factors that can be used in measuring business value.
References:
*EPI Data Centre Training Framework1
*EPI Data Centre Competence Framework2
*Measuring the Business Value of IT3
*How to Measure the Business Value with Effective Data Quality Governance
*7 Rules for Demonstrating the Business Value of IT
NEW QUESTION # 42
What is the purpose of a service corridor?
- A. To create a secure and conditioned environment where media can be stored in a controlled manner.
- B. It provides a secure area where supporting facilities can be serviced and monitored on a 24x7 basis without disturbing the computer room.
- C. It provides a safe, vented and secure area where standby generators can operate safely.
- D. It is a generic name for pathways leading to other rooms that contains facility supporting equipment like the UPS room, battery room, generator room etc.
Answer: B
Explanation:
A service corridor is a dedicated space within or adjacent to a data centre that allows access to the supporting facilities, such as power, cooling, fire suppression, security, and cabling systems, without interfering with the computer room operations. A service corridor helps to isolate the noise, vibration, heat, and dust generated by the supporting facilities from the sensitive equipment in the computer room. A service corridor also enhances the safety and efficiency of the maintenance and monitoring activities, as well as the flexibility and scalability of the data centre design.
References: EPI Data Centre Training Framework, CDCP Preparation Guide, Service Corridors Definition | Law Insider
NEW QUESTION # 43
What is the main risk for a data centre when the water supply fails?
- A. Failure to the water supply could result in DX cooling systems to fail.
- B. Failure to the water supply could cause issues for the cooling of back-up generators.
- C. Failure to the water supply could result in IT failure and/or denial of access to operate.
- D. Failure to the water supply could result in sudden changes of the relative humidity in the Computer room.
Answer: B
Explanation:
Back-up generators are essential for providing power to the data centre in case of a utility outage. However, back-up generators also generate a lot of heat, which needs to be dissipated by a cooling system. The cooling system may rely on water supply, either from the municipal network or from a dedicated tank. If the water supply fails, the cooling system may not function properly, leading to overheating and potential damage to the generators. This could compromise the reliability and availability of the data centre power supply and cause downtime or data loss.
References:
1: CDCP Preparation Guide, page 18, section 2.3.2 2: Data Center Generator Cooling Systems3, page 1, section 1 4: Data Center Cooling Systems5, page 1, section 1
NEW QUESTION # 44
The expected time to Recover/Repair from a system from a failure is defined as.
- A. MTTR
- B. MCBF
- C. MLBF
- D. MTBF
Answer: A
Explanation:
The expected time to recover or repair from a system from a failure is defined as MTTR (mean time to recovery or mean time to repair). MTTR is the average time it takes to restore a system or product to its normal operation after a failure. MTTR includes the time spent on detecting, diagnosing, and fixing the problem. MTTR is an important metric for measuring the reliability and availability of a system or product, as well as the efficiency and effectiveness of the incident management process. A lower MTTR indicates a faster and more reliable recovery or repair process.
References:
*EPI Data Centre Professional (CDCP®) Preparation Guide, page 17
*What is MTTR? | IBM
*Explained: All Meanings of MTTR and Other Incident Metrics
NEW QUESTION # 45
Cost of Downtime can be classified as.
- A. Mean and Median
- B. Classified and Declassified
- C. Direct and Indirect
- D. Up and Down
Answer: C
Explanation:
Cost of downtime is the total amount of money lost due to a data centre outage or disruption. It can be classified into two categories: direct and indirect. Direct costs are the immediate and measurable expenses incurred during or after an outage, such as lost revenue, lost productivity, recovery costs, compensation costs, penalties, etc. Indirect costs are the long-term and intangible impacts of an outage, such as reputation damage, customer dissatisfaction, loss of market share, legal liabilities, etc. Both direct and indirect costs can vary depending on the type, duration, and severity of the outage, as well as the industry, size, and location of the data centre.
References:
*EPI Data Centre Training Framework1
*EPI Data Centre Competence Framework2
*Understanding the Cost of Data Center Downtime3
*Uptime Institute's 2022 Outage Analysis Finds Downtime Costs and Consequences Worsening
*[INFOGRAPHIC] The Cost of Downtime: 21 Stats You Need to Know
NEW QUESTION # 46
Escape route signage should be placed where?
- A. At every door providing a pathway
- B. Only at emergency escape doors
- C. Only at the main entrance of the data centre building
- D. At every door including riser doors, doors of storage closets etc.
Answer: A
Explanation:
Escape route signage should be placed at every door providing a pathway to the exit or the assembly area, according to the CDCP Preparation Guide1 and the EU Safety/Health Signs Directive2. Escape route signage is used to guide the occupants of the data centre fromwherever they are in the building, via a place of relative safety (the escape route), to the place of ultimate safety (the assembly area). Escape route signage should not be limited to only emergency escape doors or the main entrance of the data centre building, as these may not be accessible or visible from all locations. Escape route signage should also not include doors that do not lead to the exit or the assembly area, such as riser doors, doors of storage closets, or doors of other rooms, as these may confuse or mislead the occupants. Escape route signage should be placed at every door that provides a pathway to the exit or the assembly area, and should indicate the direction and distance of the escape route using pictograms, arrows, and words. Escape route signage should also be designed and installed in accordance with the relevant standards and codes, such as BS 5499 and ISO 7010.
References:
1: CDCP Preparation Guide, page 24, section 2.4.3 2: EU Safety/Health Signs Directive3, page 1, section 1
NEW QUESTION # 47
......