IBM Power Systems with POWER8 Scale-out Technical Sales Skills V1 - C4040-251 Exam Practice Test

SAN team hopes customers will easily be able to map each LUN to a specific WWPN for each client logical partition on the Power8 server.
Which technology should be implemented to meet the requirements ?
Correct Answer: D
TION NO: 95
A customer would like build a two node active-active cluster of two 4-core AIX LPARs. The two nodes of the cluster are connected to an IBM SAN separated by 75 miles (120
Kilometers) and an SVC at each location.
What is the total number of licenses that are required for this configuration?
Correct Answer: B
Which Power Systems technology allows customers to improve utilization of physical memory assigned to an LPAR?
Correct Answer: A
A customer consolidated several environments running IBM i, Linux and AIX into an S824.
Now the system's installed memory is insufficient. The customer believes that the Active
Memory Expansion feature may resolve the memory issue.
Which of the following operating systems is capable of using the compression and decompression technology to resolve the issue?
Correct Answer: C
A company wants to consolidate six existing AIX workloads onto a single POWER8 server with six LPARs.
Which server option will satisfy the requirement?
Correct Answer: C
A technical specialist will be tasked to add partitions to an existing server.
Which browser-based tool will validate the configuration design to ensure that the requirements are
Within maximum server resources?
Correct Answer: D
Easy Tier feature on what support S822?
Correct Answer: B
A customer has a Power System S824 server with the following components:
* (1) 8-core 4.15 GHz POWER8 processor
* (1)8 Gigabit PCI Express Dual Port Fibre Channel adapter
* (1) PCIe2 Quad Port 1GbE adapter
* Power VM Standard Edition
* (1) VIO Server using one core, and (7) guest LPARs each using one core
The customer needs to add a redundant VIO Server and implement another three LPARs, each with one core.
In addition to one 8 Gigabit PCI Express Dual Port Fibre Channel adapter, which of the following components must be ordered to satisfy the minimum requirement?
Correct Answer: B
A customer is interested in PowerSC to implement PCI compliance automation.
Which of the following will satisfy the customer's requirement7
Correct Answer: A
A customer received a Total Cost of Ownership analysis report detailing the financial benefits of consolidating multiple systems onto virtual partitions on Power Scale out servers
Which of the following directly affects the power and cooling expense estimates based on the report?
Correct Answer: C
Which high-value function do Shared Storage Pools provide?
Correct Answer: B
An AIX customer is running AIX 5.3 on a POWER7 machine and wants to run this workload on a POWER8 server without upgrading their operating system.
What is their best option to migrate their workload?
Correct Answer: B
Customers are migrating from the Power7 to Power8 systems. In the new VIO server environment, they want to use storage multipathing client logical partition.
Customers should use something to meet their requirements ?
Correct Answer: D