Latest [Sep 23, 2021] SAP P-S4FIN-2020 Exam Practice Test To Gain Brilliante Result [Q10-Q25]

Share

Latest [Sep 23, 2021] SAP P-S4FIN-2020 Exam Practice Test To Gain Brilliante Result

Take a Leap Forward in Your Career by Earning SAP P-S4FIN-2020

NEW QUESTION 10
What are the improvements to new cash pooling? There are 2 correct answers to this question.

  • A. You can set deficit and excess tolerances. If the balance is between the tolerances, no transfer is made.
  • B. The balance before concentration and the simulated balance after the concentration can be compared.
  • C. The business user can define "expected amount" and "minimal movement amount" for every bank account without configuration.
  • D. Different payment methods for payment requests can be specified in different paying company codes.

Answer: B,C

 

NEW QUESTION 11
A document can have up to 999999 line items in the universal journal (reposing or G/L view). How does this affect the entry view (table BSEG)?

  • A. It is extended to 999999 line items
  • B. The entry view is also based on the universal journal
  • C. The system splits the single entry into multiple documents as required
  • D. It is limited to 999 items

Answer: D

 

NEW QUESTION 12
When does a document posted in controlling become Visible in financial accounting? Please choose the correct answer.

  • A. When real-time integration is active for the company code
  • B. When document splitting is active for the company code
  • C. When FI account assignments (such as the segment) change
  • D. When any primary or secondary cost and revenue accounts are posted

Answer: D

 

NEW QUESTION 13
Where can you view the cost of goods sold (COGS) postings per cost component in CO-PA? Note: There are 3 correct answers to this question.

  • A. Actual COGS (based on actual costing) in account-based CO-PA
  • B. Moving average COGS in account-based CO-PA
  • C. Actual COGS (based on material ledger) in cost-based CO-PA
  • D. Standard COGS in account-based CO
  • E. Standard COGS in cost-based CO-PA

Answer: C,D,E

 

NEW QUESTION 14
How data is converted during an SAP S/4HANA standard conversions?

  • A. Only company codes flagged as productive with all years
  • B. All company codes for the years you specify
  • C. All company codes with all data of all years
  • D. Only company codes and years selected in the customizing for migration

Answer: C

 

NEW QUESTION 15
You activate account-based CO-PA (Profitability Analysis) during migration. How is the system affected?
There are 3 correct answers to this question.

  • A. Characteristics will be added to universal journal
  • B. Cost based CO-PA can still be used in parallel
  • C. Cost component split (COGS) can be configured in financial accounting
  • D. Value fields will be added to the universal Journal
  • E. Historical data will be enriched with characteristics by derivation

Answer: A,B,C

 

NEW QUESTION 16
What open period is checked by the third interval of the Open Posting Periods variant in financial accounting?

  • A. Postings to FI Subledgers
  • B. Postings from CO to FI
  • C. Postings with a special authorization group
  • D. Postings to special periods

Answer: B

 

NEW QUESTION 17
What data is migrated during system conversion? Please choose the correct answer.

  • A. All company codes with all data of all years.
  • B. Only company codes flagged as productive with all years
  • C. All company codes for the years you specify
  • D. Only company codes and years selected in the customizing for migration

Answer: A

 

NEW QUESTION 18
On what level can you assign a fiscal year variant to a company code?

  • A. Accounting principle
  • B. Depreciation area
  • C. Ledger
  • D. Valuation area

Answer: A

 

NEW QUESTION 19
On which levels can you assign different technical clearing accounts for integrated acquisition in asset accounting. NOTE: There are 2 correct answers to this question

  • A. Company code
  • B. Transaction code
  • C. Account determination
  • D. Chart of accounts

Answer: C,D

 

NEW QUESTION 20
Which objects do you need to configure in SAP S/4HANA after a conversion from classic G/L to SAP S/4HANA? There are 2 correct answer to this question.

  • A. Document type
  • B. Accounting principle
  • C. Currency type
  • D. Valuation area

Answer: B,D

 

NEW QUESTION 21
Your customer wants a new ERP solution and is looking at the SAP S/4HANA software. The customer has a skilled in-house IT team that they want to upskill and keep moving the forward. They want maintain a filly customizable solution without completely disrupting their current processes. Which SAP S/4HANA solution will you propose?

  • A. Private cloud
  • B. Public cloud
  • C. Hybrid
  • D. On-premise

Answer: D

 

NEW QUESTION 22
You carry forward balances for your company code and leading ledger to the new fiscal year 2021 and year What could resolve the error?

  • A. Post revaluation and new valuation (transition AR29N) for fiscal year 2020
  • B. Post all depreciation (transaction AFAB) for the fiscal year 2020
  • C. Run the fiscal year change (transition FAA_CMP) to close fiscal year 2019
  • D. Run "calculate depreciation" (transition AFAR) for fiscal year 2021

Answer: C

 

NEW QUESTION 23
How can financial data be stored in the SAP S/4HANA system tables? Note: There are 2 correct answers to this question.

  • A. There can be a line item in BSEG without a corresponding document in BKPF.
  • B. There can be a line item in ACDOCA without a corresponding line item in BKPF.
  • C. There can be a line item added in BSEG without a corresponding line item in ACDOCA.
  • D. There can be a line item in ACDOCA without a corresponding line item in BSEG.

Answer: B,D

 

NEW QUESTION 24
In which sequence do you create the objects required for the SAP financial closing cockpit?

  • A. 1. Define closing periods
    2. Create task lists
    3. Release task lists
    4. Release closing periods
  • B. 1. Create template
    2. Create tasks
    3. Create task lists
    4. Release task lists
  • C. 1. Define task levels
    2. Create task group
    3. Release task levels
    4. Release task group
  • D. 1. Create task group
    2. Create task lists
    3 Create tasks
    4. Release task lists

Answer: B

 

NEW QUESTION 25
......

Authentic Best resources for P-S4FIN-2020 Online Practice Exam: https://www.examslabs.com/SAP/SAP-Certified-Application-Professional/best-P-S4FIN-2020-exam-dumps.html