NEW QUESTION 30
A company manufactures high-end speaker systems. You have different configurations available for customers to customize features including finishes and speaker materials. You have a product configuration model with bill of material lines and conditions for each component.
A customer can optionally add on protective covers, but only if a non-metal material is selected. If any other material is selected, the covers cannot be added. You add the following attributes:
You need to create an expression-based constraint that will only allow Corner Protection if Metal is not selected.
How should you complete the expression? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 31
You manage pricing for a food processing company. The raw materials used by the business is a commodity-traded product and has a changing purchase price.
You must implement the commodity pricing module. You create a pricing template with margin data.
You need to calculate the cost price for the manufactured goods as well as the sales price based on margin standards.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 32
A company uses manufacturing execution for processing of production orders.
Multiple production orders from last week need to be ended.
You need to process the time registrations to allow the orders to end.
Which four steps should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 33
You need to configure each item for plastic manufacturing.
Which production types should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 34
A company plans to implement Dynamics 365 for Finance and Operations.
You need to determine which manufacturing solutions to use.
Which manufacturing solution should you use? To answer, drag the appropriate setting to the correct drop targets. Each source may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

 

NEW QUESTION 35
You need to create the constraint for the ML seat selection.
Which expression constraint should you use?

  • A. Implies[Trim==Legend,Seat==ML]
  • B. [Trim==Legend|Seat==ML]
  • C. Implies[Seat==ML,Trim==Legend]
  • D. Seat!=ML

Answer: C

 

NEW QUESTION 36
A manufacturer uses discreet orders and manually consumes raw material after reporting products as finished.
You are performing an end-of-month closing for remaining picking lists on production orders. You must not be required to consume the full amount of material on production order picking lists as a result of improved production efficiency. When the production manager verifies that no material is left to consume, there are remaining back-ordered amounts.
You need to pick the line item short and eliminate the remaining demand.
What should you do?

  • A. Delete the item from the Bill of materials for the finished good.
  • B. Enter the consumption amount on the line to match the actual amount used, and delete the remaining amount.
  • C. Enter the consumption amount on the line to match the actual amount used and select end on the production order picking list.
  • D. Change the Coverage group on item option to manual.

Answer: C

Explanation:
Section: Create, process, and manage production batch orders

 

NEW QUESTION 37
Note: This question is part of series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses batch tracking of raw materials, semi-finished goods, and finished goods.
It is difficult to determine when semi-finished and finished goods were produced and expired.
You need to incorporate automatic batch expiration dates for tracked items that are produced.
Solution:
1. Create a new batch number group that includes production activation in the settings.
2. Assign the group to the produced items.
3. Assign shelf life period in days to the items that require expiration dates.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

 

NEW QUESTION 38
A company uses Process manufacturing for most products and Discreet manufacturing for other products. The company is creating a formula for a new product. The new item will be used to make a name brand product and two generic brand products.
This item has the following requirements:
* Production of the name brand and generic products must use the same formula.
* The company must produce all three items at the same time.
You need to create a produced item that can make two generic items and one main item.
How should you set up the item?

  • A. Create the name brand item as a Bills of material production type item.
    Add the two generic items on the Bills of material for the name brand product and use line type phantom.
  • B. Create the name brand item as a Bills of material production type item.
    Create the two generic items as a sub-assembly on the Bills of material for the name brand product.
  • C. Create the name brand product as the main product and use a formula production type.
    Create the two generic products as co-products as part of the formula for the name brand product.
  • D. Create the name brand product as the main product and use a formula production type. Create the two generic items as a formula planning production type planning items. Copy the formula from the name brand item into each of the generic items.

Answer: A

 

NEW QUESTION 39
A company produces pipe at certain fixed lengths.
The company must be able to schedule cutting machines. You set up the cutting machines as resources. All cutting resources can produce many of the products. There are some products that require cutting machines that can produce longer lengths of product. Only some of the machines can do this.
You need to configure the resources to account for these different products.
What should you do?

  • A. Create a resource for each length.
  • B. Create a resource group for each length.
  • C. Configure the Data/Hour option on the Capacity unit field on the resource.
  • D. Build capability related to length and assign to the appropriate resources.

Answer: D

Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/tasks/define-resource-capabilitie

 

NEW QUESTION 40
You are the production supervisor at a chemical processing plant. You must track attributes for each batch of chemicals. Automated quality orders must be generated when a batch order for these chemicals is reported as finished.
You need to ensure that the values of attributes are updated and tracked.
What three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Set up batch attributes
  • B. Assign the attributes to the appropriate test on the test group
  • C. Create a test instrument for each attribute
  • D. Assign the attributes to the chemicals
  • E. Create attribute types

Answer: A,C,D

 

NEW QUESTION 41
You are the production supervisor at a manufacturing company. You are in the process of configuring the production control module and its parameters.
A company plans to use manufacturing execution. Bill of materials (BOM) item consumption must be generated when items are reported at the operation level.
You need to configure the Manufacturing execution production order defaults form to allow for back flushing on operations.
How should you set up Automatic BOM consumption? To answer, drag the appropriate setting to the correct targets. Each source may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/production-parameters-manufacturing-execution

 

NEW QUESTION 42
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company uses Dynamics 365 Supply Chain Management to manage production configuration.
A product designer creates a remote control toy that can be purchased with different tire sizes.
Sales representatives need to perform product configuration for the custom tire variants when they create a new order.
Solution: Select the custom tire size when filling out the item requirement line.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

 

NEW QUESTION 43
A company uses Dynamics 365 Process manufacturing.
Employees work a half day so that they can attend a company event. You have a rush order that must be completed that same day.
After reviewing the net requirements of the batch order, only 400 of the total quantity of 1400 units must be completed today. The production manager must retain the original batch number as the quantity of 400. The original batch number must appear on documentation for the customer.
You need to split the batch order into two orders.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

 

NEW QUESTION 44
A company uses separate finished good item numbers for size variations of the same product.
The company wants to minimize the number of variously-sized items that are created.
You need to perform the setup to allow variants in size to the product master.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

 

NEW QUESTION 45
You need to configure production control parameters for liquid cleaning solution manufacturing.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.

  • A. Select the Block editing option only.
    D18912E1457D5D1DDCBD40AB3BF70D5D
  • B. Require an electronic signature when the formula is approved.
  • C. Select the Block removal of approval option for the formula
  • D. Select Block editing and approve the formula.

Answer: C,D

Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/formulas-versions

 

NEW QUESTION 46
A company uses manufacturing execution for processing of production orders.
Multiple production orders from last week need to be ended.
You need to process the time registrations to allow the orders to end.
Which four steps should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 47
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company uses Dynamics 365 Supply Chain Management to manage production configuration.
A product designer creates a remote control toy that can be purchased with different tire sizes.
Sales representatives need to perform product configuration for the custom tire variants when they create a new order.
Solution: Select the custom tire size when filling out each sales quotation line.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

 

NEW QUESTION 48
You are the production supervisor in charge of setting effective cost prices for the labor force in a manufacturing company. It is the end of the year and the labor rates have been recalculated based on new salary data. You need to update the effective labor costs for all labor groups.
Which element must be updated?

  • A. shared category
  • B. resource group
  • C. production orders
  • D. cost groups
  • E. cost category

Answer: C

 

NEW QUESTION 49
A process manufacturing company is implementing rebates in Dynamics 365 for Finance and Operations for some of their customers on specific items.
You are the production consultant in charge of implementing the processes needed for calculating and applying the rebates for the subset of customer and items.
You need to implement the order of transactions to process the rebates.
In which order should the actions be performed? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/sales-marketing/tasks/process-customer-rebates

 

NEW QUESTION 50
A manufacturing company uses license plates for inventory tracking of all materials. Part M92020 is stored with 30 units for each license plate. You create a production order that indicates one unit of part M9202 and release the order for picking. There is no inventory currently available in the production input location.
The warehouse fast-tab setup for part M92020 is shown below.

Use the drop-down menus to select the answer choice that answers each question based on the information presented in the graphic. NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 51
A company is looking to use Dynamics 365 for Finance and Operations.
The company is in the process of redesigning and retooling an existing manufacturing plant to group similar, cellular operations to improve efficiency and minimize wasted time between operations. They want to locate raw materials close to where they are needed without losing reorder visibility.
You need to set up their environment.
Which kind of production type should you implement?

  • A. Lean manufacturing
  • B. Process manufacturing
  • C. Manufacturing execution
  • D. Discrete manufacturing

Answer: A

Explanation:
Section: Set up and configure manufacturing

 

NEW QUESTION 52
A company uses Dynamics 365 Process manufacturing.
Employees work a half day so that they can attend a company event. You have a rush order that must be completed that same day.
After reviewing the net requirements of the batch order, only 400 of the total quantity of 1400 units must be completed today. The production manager must retain the original batch number as the quantity of 400. The original batch number must appear on documentation for the customer.
You need to split the batch order into two orders.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

1 - Select the batch order.
2 - Select Split
3 - Enter 1,000 in the split quantity field.

 

NEW QUESTION 53
......

100% Updated Microsoft MB-320 Enterprise PDF Dumps: https://www.examslabs.com/Microsoft/Microsoft-Dynamics-365/best-MB-320-exam-dumps.html