2023 Latest C_IBP_2211 DUMPS Q&As with Explanations Verified & Correct Answers [Q35-Q55]

Share

2023 Latest C_IBP_2211 DUMPS Q&As with Explanations Verified & Correct Answers

C_IBP_2211 dumps Exam Material with 80 Questions


SAP C_IBP_2211 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Optimize the integration scenarios and architecture of your planning solution.
  • Create and transform forecasts in your planning model
Topic 2
  • Describe how IBP extends the logic of S&OP in the network using advanced demand and supply planning integrated with financial plans
Topic 3
  • Configure supply planning, run various solvers to generate planning results
  • Model Supply Processes
Topic 4
  • Define and view information with user-defined charts and dashboards
  • Analytics and Reporting
Topic 5
  • Configure and use Planning Operators to automate processes in your planning model
  • Planning Operators & Application Jobs
Topic 6
  • Optimize inventory in the supply chain utilizing algorithms that derive inventory targets
  • Model Sales & Operations Processes

 

NEW QUESTION 35
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note:
There are 2 correct answers to this question.

  • A. Copying multiple key figures on different planning levels is not possible.
  • B. Copying multiple key figures can be processed sequentially.
  • C. If necessary target key figures values are disaggregated.
  • D. If necessary source key figures values are disaggregated.

Answer: B,C

 

NEW QUESTION 36
Using the import/export functionality means working with groups of items that are organized into collections.What is the best practice for managing collections?

  • A. You should delete collections after they have been transported.
  • B. Configuration items should be bundled in the collections based on the SAP IBP project stream.
  • C. A planning area with its time profile must be bundled in one collection.
  • D. A planning area with the copy operators assigned must be bundled in one collection.

Answer: C,D

 

NEW QUESTION 37
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.

  • A. Transportation lead times
  • B. Adjusted transport receipts
  • C. Minimum lot size
  • D. Aggregated constraints
  • E. Maximum lot size

Answer: A,B,E

 

NEW QUESTION 38
What function would you use to configure a year-to-date calculation?

  • A. Rolling Aggregation
  • B. Dynamic Rolling Aggregation
  • C. Cumulative Aggregation
  • D. Last Period Aggregation

Answer: C

 

NEW QUESTION 39
Which of the following key functions are supported by SAP IBP for sales and operations?Note: There are 2 correct answers to this question.

  • A. Simple statistical forecast
  • B. Multi-Level Supply Planning Heuristics
  • C. Scenario analysis for operational supply planning
  • D. Time series analysis

Answer: A,B

 

NEW QUESTION 40
Which of the following key functions are supported by SAP IBP for sales and operations?Note: There are
2 correct answers to this question.

  • A. Simple statistical forecast
  • B. Multi-Level Supply Planning Heuristics
  • C. Scenario analysis for operational supply planning
  • D. Time series analysis

Answer: A,B

 

NEW QUESTION 41
You need to define a new logic for a key figure to drive values from the PERPRODCUSTREGION level to the PERPRODCUST level.Which of the following configuration options are possible for this process?Note: There are 2 correct answers to this question.

  • A. Splitting the values from aggregated to detailed level using multiplication by the proportions
  • B. Splitting the values from aggregated to detailed level, based on the time profile attribute
  • C. Splitting the values from detailed to aggregated level by using a copy operator
  • D. Splitting the values from aggregated to detailed level, based on a stored split-factor key figure

Answer: A,D

 

NEW QUESTION 42
You need to create time periods for the time profile in a planning area.What should you be aware of when running the Create Time Periods application job?

  • A. This application job can be run for multiple time profiles at once.
  • B. A time profile has to be activated so that the application job can proceed.
  • C. The assigned Planning Area must be active.
  • D. In the Parameter Section of the application job, choose the Time Profile ID and Planning Area.

Answer: D

 

NEW QUESTION 43
You define fixing for a key figure.Which of the following functions are available for this key figure? Note: There are 2 correct answers to this question.

  • A. Fixing is possible for a certain quantity of a key figure value.
  • B. Fixing is possible for system editable key figures.
  • C. Fixing is possible for a certain period, including all child values in the hierarchy.
  • D. Fixing is possible for manually editable key figures.

Answer: B,C

 

NEW QUESTION 44
Which type of Master Data will be represented by the Master Data Type LOCATIONFR?

  • A. Reference Master Data Type
  • B. Compound Master Data Type
  • C. Virtual Master Data Type
  • D. External Master Data Type

Answer: A

 

NEW QUESTION 45
What are some of the prerequisites for configuring a planning area that results in a successful consistency check?Note: There are 2 correct answers to this question.

  • A. Specify a planning horizon in the planning area for each level of the assigned time profile.
  • B. Configure at least one calculated key figure for the planning area.
  • C. Assign the compound master data type and its component master data types.
  • D. Configure at most two input key figures on the same planning level in a key figure calculation.

Answer: A,C

 

NEW QUESTION 46
Which conditions have to be fulfilled as a prerequisite to maintain a key figure disaggregation?Note: There are 2 correct answers to this question.

  • A. The key figure is stored and all editable.
  • B. The key figure is calculated and system editable.
  • C. The key figure is calculated and all editable.
  • D. The key figure is stored and system editable.

Answer: A

 

NEW QUESTION 47
For which of the following application jobs can you enter planning filters as parameters?Note: There are 2 correct answers to this question.

  • A. Purge Master Data
  • B. Purge Non-Conforming Data
  • C. Create Time Periods for Time Profiles
  • D. Purge Key Figure Data

Answer: A,D

 

NEW QUESTION 48
A time profile is defined with these levels: day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?

  • A. IF("PERIODID5" ="$$PERIODID5CU$$...)
  • B. IF("PERIODID4" ="$$PERIODID4CU$$...)
  • C. IF("PERIODID3" ="$$PERIODID3CU$$...)
  • D. IF("PERIODID2" ="$$PERIODID2CU$$...)

Answer: B

 

NEW QUESTION 49
You want to display and edit data in different Units of Measure (UOM).Which of the following must you consider before you use the UOM?Note: There are 3 correct answers to this question.

  • A. Units of measure are usually not time-independent.
  • B. Unit of measure is an attribute of a master data type, such as Product.
  • C. Units of measure are usually not time-dependent.
  • D. Conversion to the target unit of measure is handled by SAP IBP Excel UI
  • E. Analytics provide the user with the option to select the target unit of measure.

Answer: B,C,E

 

NEW QUESTION 50
What does ABC/XYZ segmentation allow you to do?Note: There are 2 correct answers to this question.

  • A. Choose time-independent key figures as segmentation measures.
  • B. Substitute missing values in case of sporadic demands.
  • C. Identify inventory items that require closer attention.
  • D. Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B".

Answer: A,C

 

NEW QUESTION 51
You are modeling a new product introduction.Which of the following steps can be part of your modeling process in the Manage Product Lifecycle app?Note: There are 2 correct answers to this question.

  • A. Copy the launch dimension from the reference product to the new product
  • B. Create planning objects for new combinations in the app
  • C. Enter the Phase-out Start Date and Phase-out End Date
  • D. Enter the product family to which the new product belongs

Answer: A,B

 

NEW QUESTION 52
You are starting a new implementation project for SAP IBP and are considering the possible system architecture.What are the possible approaches for setting up the system landscape?Note: There are 2 correct answers to this question.

  • A. Create additional planning areas in the test system to support training needs.
  • B. Create additional test planning areas in the production system to support cutover needs.
  • C. Set up a two-tier landscape, and have the configuration of the development system regularly updated from the production system.
  • D. Set up a three-tier landscape using transport, starting from the development system to test and production.

Answer: C,D

 

NEW QUESTION 53
Which of the following are functions of SAP IBP for demand?Note: There are 2 correct answers to this question.

  • A. Detailed statistical analysis of demand data using predictive analytics tools
  • B. Embedded, on-the-fly demand analytics
  • C. Demand sensing of demand data using predictive analytics tools
  • D. Consideration of demand-driven analysis for buffer positioning.

Answer: A,B

 

NEW QUESTION 54
You need to make manual adjustments to your S&OP plan.Which are possible ways of making these changes?Note: There are 2 correct answers to this question.

  • A. Leveraging the web-based planning capability
  • B. Leveraging the functionality of SAP Workzone
  • C. Using Microsoft Excel planning views
  • D. Using Driver-Based planning

Answer: A,C

 