Huawei HCS-Wireless Hardware Installation(Written) - H35-910-ENU Exam Practice Test

When the outdoor feeder enters the room, lightning protection grounding is required to protect the equipment from lightning damage.
Correct Answer: B
What are both sides in the "high-risk operation" 100% both sides authorization refer?
Correct Answer: C
Which of the following description are correct about the interface of the UMPT board? (Multiple Choice)
Correct Answer: C,D
Regarding the work high above the ground PPE, which is the correct statement?
Correct Answer: C
Which of the following is the safety protection technology for the device?
Correct Answer: C
Operation of electrical equipment must be authorized, qualified and competent.
Correct Answer: B
Which of the following should be the ground wire path?
Correct Answer: A
What is the binding method of the hanger during the lifting process?
Correct Answer: A
After "high-risk operation", it is only necessary to verify that "there is no new alarm and abnormal performance event" after the operation, then the operation is successful.
Correct Answer: A
Which of the following is the focus of safety accident work?
Correct Answer: B
The use of a combiner can effectively save feeder resources.
Correct Answer: B
In the process of replacing the signal cable and the power cable, the cable connection can be directly implemented according to the cable label. It is not necessary to perform the line sequence check according to the cable route.
Correct Answer: A
Which of the following boards does the basic configuration of the BBU mainly include? (Multiple choice)
Correct Answer: A,B,D,E