Oracle Utilities Customer Cloud Service 2022 Implementation Professional - 1z0-996-22 Exam Practice Test
Your client has the following requirements:
Many customers are installing their own solar electrical generationequipment. When these customers generate more electricity than required for their own use, the surplus can he exported back to the power grid.
In order to measure this generation, we have installed special scalar devices. These devices have separate registers to measure the energy generated (export) and the energy received (import) from the National Grid.
Both reads will be stored in kWh, but the import is subtractive and export is consumptive.
What solution should you choose to configure the measuring component types for these specific requirements?
Many customers are installing their own solar electrical generationequipment. When these customers generate more electricity than required for their own use, the surplus can he exported back to the power grid.
In order to measure this generation, we have installed special scalar devices. These devices have separate registers to measure the energy generated (export) and the energy received (import) from the National Grid.
Both reads will be stored in kWh, but the import is subtractive and export is consumptive.
What solution should you choose to configure the measuring component types for these specific requirements?
Correct Answer: D
Explanation: Only visible for ExamsLabs members. You can sign-up / login (it's free).
You are configuring a VEE group to include rules to be executed when loading the initial measurement data (IMD).
What is the VEE group directly associated with?
What is the VEE group directly associated with?
Correct Answer: B
At what stage in the initial measurement data (IMD) import process will the application of meter multipliers be performed?
Correct Answer: B
Explanation: Only visible for ExamsLabs members. You can sign-up / login (it's free).
Which entity defines the type of collection process to start based on ageof debt, amount of debt, and type of customer?
Correct Answer: A
Explanation: Only visible for ExamsLabs members. You can sign-up / login (it's free).
How many derived values can a final measurement have in addition to the primary measured value?
Correct Answer: C
Explanation: Only visible for ExamsLabs members. You can sign-up / login (it's free).
New: An electric utility is starting an Advanced Meter Infrastructure (AMI) roll-out for their residential customers. The initial plan is to roll out devices from their manufacturer with potentially three different device models. The customer has not decided what head-end systems they will use to communicate with these devices. Based on the customer's initial roll-out strategy, the devices will haveto be configured consistently to support existing tariffs for billing.
Which is a valid consideration to determine the setup of device type administrative data for this implementation?
Which is a valid consideration to determine the setup of device type administrative data for this implementation?
Correct Answer: A
Explanation: Only visible for ExamsLabs members. You can sign-up / login (it's free).
Your implementation requires an installation of two types of devices:
Electric Smart Meter
Gas Manual Meter
Which two Device Type attributes are required to identify these device types? (Choose two.)
Electric Smart Meter
Gas Manual Meter
Which two Device Type attributes are required to identify these device types? (Choose two.)
Correct Answer: A,C
Explanation: Only visible for ExamsLabs members. You can sign-up / login (it's free).