NCARB ARE 5.0 Project Management (PjM) - Project-Management Exam Practice Test
The architect's contract with the owner has a budget of construction cost, and the architect has established a budget of cost in the mechanical engineer's contract. The mechanical bid package is 36% over the budget.
What is the engineer required to do?
What is the engineer required to do?
Correct Answer: C
Explanation: Only visible for ExamsLabs members. You can sign-up / login (it's free).
While conducting a site visit for a residential tower delivered through the design-build method, an architect observes several construction workers without hard hats and other unsafe working conditions.
How should the architect proceed?
How should the architect proceed?
Correct Answer: D
Explanation: Only visible for ExamsLabs members. You can sign-up / login (it's free).
What is the architect's primary responsibility when responding to a contractor's Request for Information (RFI) during construction?
Correct Answer: B
Explanation: Only visible for ExamsLabs members. You can sign-up / login (it's free).
Which scheduling method shows the longest path of dependent activities?
Correct Answer: B
Explanation: Only visible for ExamsLabs members. You can sign-up / login (it's free).
According to ATA owner-architect agreements, who is responsible for the cost of evaluating significant substitutions proposed by the contractor, subcontractors, or suppliers and the cost of making subsequent revisions to drawings, specifications, and other documentation?
Correct Answer: D
Explanation: Only visible for ExamsLabs members. You can sign-up / login (it's free).
In response to a request for qualifications for a prospective project, the architect assembles a project team of mechanical, electrical, plumbing, and fire protection engineers.
What is the project?
What is the project?
Correct Answer: A
Explanation: Only visible for ExamsLabs members. You can sign-up / login (it's free).
During which project phase is the architect primarily responsible for preparing detailed construction drawings and specifications?
Correct Answer: C
Explanation: Only visible for ExamsLabs members. You can sign-up / login (it's free).
According to AIA Document A201, who is responsible for obtaining permits and licenses required for the project?
Correct Answer: D
Explanation: Only visible for ExamsLabs members. You can sign-up / login (it's free).