SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP4 - C_TSCM42_64 Exam Practice Test
The company that you advise does not want to manage certain value-intensive materials in the warehouse stock. Instead, the user wishes to control material provision in such a way that these materials are procured directly for the production and/or process order.
How can you fulfill this request? (Choose two.)
How can you fulfill this request? (Choose two.)
Correct Answer: A,B
In your company planning strategies are used in the SAP-ECC demand management that are based on consumption. Which of the following statements about consumption is true?
(Choose two.)
(Choose two.)
Correct Answer: A,C
In the task list, there is the possibility to work with suboperations.
What can you do in more detail by using suboperations? (Choose two.)
What can you do in more detail by using suboperations? (Choose two.)
Correct Answer: A,C
In SAP ECC, you want to map an in-house production process for general warehouse production. The fields in the area of the lot size-dependent in-house production time are to be populated when the material master for the final product is created. These fields can be maintained by updating from the scheduling result for the associated routing. You now think that there could be significant changes to the production times in the routing and decide against updating the material master. What problem could this lead to?
Correct Answer: C
From what point can you no longer use the Read PP master data in the production order?
Correct Answer: B
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters used for scheduling? (Choose three.)
Correct Answer: A,B,C
An enterprise wants to absorb the uncertainty caused by fluctuating demand for a finished product by means of a buffer variable in SAP ECC. They suggest a dynamic safety stock.
What specifications are used to calculate the dynamic safety stock?
What specifications are used to calculate the dynamic safety stock?
Correct Answer: A
Which objects can you use in the production order for a material component to propose the storage location in its reservation? (Choose three.)
Correct Answer: B,C,D