A facility owner is considering installing a new chiller. The installed project cost will be $300,000. The annual savings from the energy-saving project will be $45,000 for the 20-year life of the chiller. If an energy- service company requires a minimum 20% return on investment (pre-tax), will the energy-service company agree to finance this project?
Correct Answer: B
Which of the following is the primary benefit of integrating energy management with a Building Automation System (BAS) in a commercial facility?
SELECT THE CORRECT ANSWER
Correct Answer: C
A high-pressure steam system passes 180°C condensate (saturated liquid) through a steam trap to an atmospherically vented condensate receiver tank. If the steam trap is working properly, how much of the condensate mass can be lost out the vent of the receiver tank in the form of flash steam?
Correct Answer: B
Thermal scans of electrical equipment are useful for:
Correct Answer: C
Explanation: Only visible for ExamsLabs members. You can sign-up / login (it's free).
A compressed-air distribution system has one section that frequently has low pressure when demand for compressed air is high. How can you resolve the problem without increasing energy consumption?
Correct Answer: B
How does an enthalpy-based economizer control operate?
Correct Answer: C