IBM Power Systems with POWER8 Enterprise Technical Sales Skills V1 - C4040-252 Exam Practice Test
A new customer has a requirement to analyze the effects of activating two cores on an E870 and 32GB of memory for one month.
What is the most cost-effective Capacity on Demand (CoD) offering that would satisfy this requirement?
What is the most cost-effective Capacity on Demand (CoD) offering that would satisfy this requirement?
Correct Answer: B
What Power Systems Virtual Switch mode can be used to prevent LPAR to LPAR network traffic within the system?
Correct Answer: A
Compared to x86, what feature of POWER8 processor technology permits more efficient
processor core utilization to support highly threaded applications?
processor core utilization to support highly threaded applications?
Correct Answer: B
Explanation: Only visible for ExamsLabs members. You can sign-up / login (it's free).
Which interface supports connectivity between the POWER8 processor and the accelerator on the S824L?
Correct Answer: B
Explanation: Only visible for ExamsLabs members. You can sign-up / login (it's free).
Which of the following is a feature in PowerVM?
Correct Answer: D
Explanation: Only visible for ExamsLabs members. You can sign-up / login (it's free).
A customer has older generations of Power servers that they want to manage with their E870 server from the same 7042-CR8 HMC running V8R8.2.0.
What is the earliest Power server generation that is supported with this HMC level?
What is the earliest Power server generation that is supported with this HMC level?
Correct Answer: C