Oracle EBS R12.1 Inventory Essentials - 1Z0-519 Exam Practice Test
Your customer completes four production orders on a daily basis. One of the production orders has quality problems on some finished-good items. The requirements for this situation are:
i) Isolate the defective material from the regular production order output.
ii) The system should prevent this material from being included in external customer order shipments.
What setup or process can achieve these objectives?
i) Isolate the defective material from the regular production order output.
ii) The system should prevent this material from being included in external customer order shipments.
What setup or process can achieve these objectives?
Correct Answer: A
XYZ Is a Chemical manufacturing company. On a daily basis, it produces 100 kilos of Item A from a single production batch.
100 kilos of item A manufactured from a single batch has a single expiration date. However, the purity of item A varies as follows:
Category 1: 95%
Category 2: 85%
Category 3: 50%
From an implementation perspective, which setup or process would meet this requirement?
100 kilos of item A manufactured from a single batch has a single expiration date. However, the purity of item A varies as follows:
Category 1: 95%
Category 2: 85%
Category 3: 50%
From an implementation perspective, which setup or process would meet this requirement?
Correct Answer: B
Which three statements are true regarding Inventory replenishment methods? (Choose three.)
Correct Answer: C,E,F
ABC Inc. added a new Operating Unit to Its existing Multi-Org Access-enabled responsibility. When users logged in using their existing responsibility, they could not see the new Operating Unit in the fist of values.
What could be the cause?
What could be the cause?
Correct Answer: E
XYZ Corp. has acquired ABC Corp. XYZ operates with Mufti-Org Access Control. Consequently XYZ Corp.
needs to add additional Operating Units. Identify the statement that describes the sequence for adding additional Operating Units.
needs to add additional Operating Units. Identify the statement that describes the sequence for adding additional Operating Units.
Correct Answer: C
Your customer is Interested In Implementing revision control for the finished goods model Items. Which two requirements can be met by implementing revision control? (Choose two.)
Correct Answer: D,E