Peoplecert PRINCE2 Foundation - PC0-004 Exam Practice Test
Identify the missing words in the following sentence.
The Team Manager should check the [ ? ] for any interfaces that must be maintained while developing products.
The Team Manager should check the [ ? ] for any interfaces that must be maintained while developing products.
Correct Answer: D
Identify the missing words in the following sentence.
A benefit of adopting PRINCE2 is that it can be applied to [ ? ] - and can easily be implemented alongside specialist techniques.
A benefit of adopting PRINCE2 is that it can be applied to [ ? ] - and can easily be implemented alongside specialist techniques.
Correct Answer: B
Which role is part of the project management team?
Correct Answer: A
Which activity takes place within the Managing a Stage Boundary process?
Correct Answer: C
Which does the Executive need to ensure is in place before the project is initiated?
Correct Answer: B
Which is NOT a PRINCE2 principle?
Correct Answer: D
Which describes the 'Implement' step within the recommended risk management procedure?
Correct Answer: C
Who should use the information in a Lessons Report to refine, change and improve the standards within a quality management system?
Correct Answer: C
Identify the missing word in the following sentence. The [?] theme defines that the Project Board is responsible for the overall direction and management of the project,
Correct Answer: C
Which is a purpose of a Lessons Log?
Correct Answer: D
Which of the following statements about the Project Initiation Documentation are true?
1. The Project Initiation Documentation is used to ensure that a sound basis exists exists before the Project Board authorizes a project.
2. The Project Initiation Documentation should be updated at the end of each stage to reflect the current status of a project before the Project Board authorizes a project.
1. The Project Initiation Documentation is used to ensure that a sound basis exists exists before the Project Board authorizes a project.
2. The Project Initiation Documentation should be updated at the end of each stage to reflect the current status of a project before the Project Board authorizes a project.
Correct Answer: A
Which is a typical core activity within configuration management?
Correct Answer: B
Which is a purpose of the Project Product Description?
Correct Answer: C
Which of the following describes a use of a Configuration Item Record?
Correct Answer: A