SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 - C_TSCM42_67 Exam Practice Test

The company you advise wants to control the availability check in so that when a production and/or process order is created, the following receipts or issues are taken into account: planned orders, purchase orders, production orders, reservations, dependent requirements. When the production and/or process order is released, only the stock that is currently freely usable should be taken into consideration. How can you fulfill this request?
Correct Answer: A
Which functions can be triggered before releasing a production order? (Choose three)
Correct Answer: A,B,D
Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system, and thus generate run schedule quantities (RSQ) from normal planned orders? (Choose three)
Correct Answer: C,D,E
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)
Correct Answer: A,B,D
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon should be set equally for all materials by default.
However, some materials need to have a different planning horizon.
Which procedure do you recommend for setting the planning horizon?
Correct Answer: D
You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting planned orders should be scheduled using basic date scheduling (not lead-time scheduling).
Which of the following properties for the resulting dependent requirements applies?
Correct Answer: A
Which of the following organizational efforts can be minimized using the KANBAN procedure?
Correct Answer: D