A business has set up an Incremental accrual plan with a Monthly Repeating period and a calendar year period that runs from January to December. The accruals have already been run for an employee till December. The employee had a grade change in June 3 as a result of which the accrual band that the employee falls into has changed.
What is the earliest period for which the accrual could be run for this employee using the Calculate Accruals and Balances ESS job to ensure that the accrual balance at the end of December reflects the right value with the change in bands?
Correct Answer: E
Which is the parameter for limiting processing to a specific set of workers in the Evaluate Absence process?
Correct Answer: B
The accrual balance of a worker at the end of an accrual term is 7 days. The carryover limit for the plan is 5 days. The carryover expiry is set to 3 months. The worker has taken 1.5 days of vacation in the first month of the new term. The repeating period of this incremental accrual plan has a Monthly frequency and the accrual granted during each period is 1.5 days.
What is the accrual balance at the end of the 6th month in this new term?
Correct Answer: B
Which four components can be linked to an absence type when editing an absence type?
Correct Answer: A,B,C,D
When assigning work schedules via Manage Work Schedule Assignment Administration task, which level has the highest priority and which level the lowest?
Correct Answer: A
An employee has the following three absence entries.
5 January 2018 to 07 January 2018
14 June 2018 to 16 June 2018
23 Nov 2018 to 25 Nov 2018
If the employee is chosen in the Person parameter of the Evaluate Absences job and the Effective Date parameter is 15 June 2018, then which of the absence entries would appear in the Absence drop-down menu?
Correct Answer: A
Your customer has a rule for Maternity entitlements according to which the qualification date is on the absence start date if actual dates are entered or if it is not entered, then the qualification date needs to be the event date (actual if available, or else, the planned date).
Which formula should you use in the absence plan setup to achieve this?
Correct Answer: C
Your customer has an absence type that is linked to an accrual plan and has "Deferred processing on initial entry" enabled.
Which ESS job will you run to ensure that the accrual plan entries are created for the absence?
Correct Answer: C
Describe the function of a documentation certification.
Correct Answer: A